3781.32 (Effective 3/27/2013) Connections or tie-ins within right-of-way

(A) Any connections or tie-ins to existing utility services within a public right-of-way shall comply with permit requirements of the public authority that has jurisdiction over that right-of-way.

 

(B) A developer or the designer employed by the developer shall not require, as a condition for entering into a contract for a project that will require excavation, that responsibility for performance of duties imposed under sections 3781.25 to 3781.32 of the Revised Code shall be assumed by a person other than the person on whom those duties are imposed under those sections. This division does not prohibit a utility from entering into any contract for the performance of duties that are imposed on a utility under those sections.

 

(C) Nothing in sections 3728.25 to 3728.32 of the Revised Code shall be construed to require a utility to relocate its underground utility facilities located at an excavation site.

 

Amended by 129th General Assembly File No. 198, HB 458, § 1, eff. 3/27/2013.

 

Effective Date: 03-14-1989 

About Us

A vital resource for Ohio residents and businesses, the Ohio Utilities Protection Service acts as a communication link between utility companies and individuals planning any digging activity. This site includes all the information you need to dig safely and protect your community.

 

 

 

Contact O.U.P.S.

Address: 4740 Belmont Ave, Youngstown, OH 44505

Phone: 1-800-362-2764

Facebook