3781.32 (Effective 3/27/2013) Connections or tie-ins within right-of-way

(A) Any connections or tie-ins to existing utility services within a public right-of-way shall comply with permit requirements of the public authority that has jurisdiction over that right-of-way.


(B) A developer or the designer employed by the developer shall not require, as a condition for entering into a contract for a project that will require excavation, that responsibility for performance of duties imposed under sections 3781.25 to 3781.32 of the Revised Code shall be assumed by a person other than the person on whom those duties are imposed under those sections. This division does not prohibit a utility from entering into any contract for the performance of duties that are imposed on a utility under those sections.


(C) Nothing in sections 3728.25 to 3728.32 of the Revised Code shall be construed to require a utility to relocate its underground utility facilities located at an excavation site.


Amended by 129th General Assembly File No. 198, HB 458, § 1, eff. 3/27/2013.


Effective Date: 03-14-1989 

About Us

A vital resource for Ohio residents and businesses, the Ohio Utilities Protection Service acts as a communication link between utility companies and individuals planning any digging activity. This site includes all the information you need to dig safely and protect your community.




Contact O.U.P.S.

P.O. Box 729
12467 Mahoning Ave
North Jackson, OH 44451